Skip to main content

Coordinate Multi-Machine Snow Clearing

13:42
22:07
427.7K views

At 13:42 in

Plowing the First Snow of the Year.

What happens here

The team employs a multi-machine strategy to clear a large parking lot. The Sno-Power truck drags snow from interior areas towards the perimeter, while the ASV skid steer pushes the accumulated snow into larger piles at the end of the lot. This coordinated effort maximizes efficiency for clearing expansive spaces.

Goal: A coordinated multi-machine strategy is used to clear a large parking lot, with a Sno-Power truck dragging snow and an ASV skid steer pushing it into piles.

Tools and materials

  • ASV Skid Steer Loader (with snow pusher)
  • Sno-Power Truck (with plow/spreader)

What they say

Hide

all the way around that in two swipes without jiggle joggling so with the snow power what i'm doing now is i'm dragging it to the end of the lot and sam is in the asv he's going to be actually pushing it up and then once i get enough snow on the opposite end of the lot where i really want to move mass quantities i go bass backwards and i just use it like a 4 16 foot pusher containment pusher it goes out 16 feet and you can angle the sides in it kick me out of the asv he wants to turn that's right i did i wanted to work in the spaceship the cabin this thing is and amazing it's amazing i love i love this well boys we got a white buffalo type situation going on here stands out of the truck

Auto-generated from the video audio.