Technique 4: Perform an Initial Lift ("Set the Tires")
4:16
10:33
92.6K views
At 4:16 in
Payloader Basics for beginners- how to run, operate & understand Heavy equipment part 1
What happens here
Immediately upon making contact with the material pile, perform a slight initial lift of the bucket, typically 5 to 10 inches. This action helps to "set the tires" by increasing downward pressure on the front tires, maximizing their contact and traction with the ground. This results in more efficient pushing and a fuller bucket.
Goal: Maximize tire traction and improve bucket loading efficiency
Tools and materials
- Volvo L120H Wheel Loader Volvo — The primary equipment being operated
What they say
(812 characters)Hide
What they say
(812 characters)Auto-generated from the video audio.