Skip to main content

Position Joist and Joist Hanger

0:02
0:31
15.7K views

At 0:02 in

Over 1,100 nails to put in?? Strapshot it is!! ..#deck #deckdesign #build #builder

What happens here

Carefully lift a pressure-treated lumber joist and place it into its designated position within the deck frame, typically between two main beams or against a ledger board. Ensure the joist is level across its top edge and correctly spaced according to your deck plans, usually 16 inches on center. Next, take a metal joist hanger and position it around the end of the joist, aligning its top flanges with the top edge of the supporting beam or ledger. The bottom of the joist should rest firmly within the hanger's seat, making solid contact with the supporting member.

Goal: Align joist and hanger for fastening

Tools and materials

  • Carpenter's Square — Ensuring joists are square (90 degrees) to the main beam or ledger
  • Level — Checking that the top edge of the joist is level
  • Measuring Tape — Checking joist spacing and ensuring accurate placement
  • Metal Joist Hanger — The connector being positioned around the joist end
  • Pressure-Treated Lumber Joist — The wooden member being positioned and installed