Preparing the Concrete Sub-Base and Formwork
11:27
18:43
18.3K views
At 11:27 in
Our Worst season yet
What happens here
Before the concrete pour, the area for the driveway and walkways must be meticulously prepared. This involves ensuring the compacted gravel sub-base is perfectly graded to achieve the desired slope for drainage. Steel reinforcement, such as rebar or wire mesh, is laid out and secured to provide structural integrity to the concrete slab, preventing cracking. Finally, sturdy formwork made of wood or metal is precisely installed along the edges of the pour area to contain the wet concrete and define the shape of the driveway.
Goal: Establish the final grade and structural reinforcement for the concrete pour
Tools and materials
- Form Boards — Creating the perimeter of the concrete pour
- Levels — Ensuring formwork is perfectly level or sloped as desired
- Rebar Ties — Securing rebar intersections
- Rebar — Providing tensile strength and crack control to the concrete slab
- String Line — Establishing and checking grade and alignment of formwork
What they say
(357 characters)Hide
What they say
(357 characters)Auto-generated from the video audio.