Skip to main content

Preparing the Concrete Sub-Base and Formwork

11:27
18:43
18.3K views

At 11:27 in

Our Worst season yet

What happens here

Before the concrete pour, the area for the driveway and walkways must be meticulously prepared. This involves ensuring the compacted gravel sub-base is perfectly graded to achieve the desired slope for drainage. Steel reinforcement, such as rebar or wire mesh, is laid out and secured to provide structural integrity to the concrete slab, preventing cracking. Finally, sturdy formwork made of wood or metal is precisely installed along the edges of the pour area to contain the wet concrete and define the shape of the driveway.

Goal: Establish the final grade and structural reinforcement for the concrete pour

Tools and materials

  • Form Boards — Creating the perimeter of the concrete pour
  • Levels — Ensuring formwork is perfectly level or sloped as desired
  • Rebar Ties — Securing rebar intersections
  • Rebar — Providing tensile strength and crack control to the concrete slab
  • String Line — Establishing and checking grade and alignment of formwork

What they say

Hide

couple of good old packs and that'll be that and a whole bunch of cleaning up and some grading and it will be on to the next one that's all I got let's get into the day for me me survival has always meant Imagining the worst possible scenario and being absolutely prepared and ready for that so that if it doesn't come everything else is cake and that's why

Auto-generated from the video audio.