Skip to main content

Floating and Finishing the Concrete Surface

13:50
18:43
18.3K views

At 13:50 in

Our Worst season yet

What happens here

After the concrete has been poured and initially leveled, the finishing process begins. First, a bull float is used to further smooth the surface, push down any aggregates, and bring the cement paste to the top, preparing it for final finishing. As the concrete stiffens slightly, workers move to hand troweling, using hand trowels and knee boards to achieve a dense, smooth, and durable finish. Edgers are used along the perimeter and expansion joints to create clean, well-defined edges, which helps prevent chipping. This meticulous work results in a professional-grade concrete surface.

Goal: Achieve a smooth, dense, and durable finished concrete surface

Tools and materials

  • Bull Float — Initial smoothing of the concrete surface and bringing paste to the top
  • Edgers — Creating neat, rounded edges along the perimeter of the concrete slab
  • Hand Trowels — Achieving a smooth, dense, and finished concrete surface
  • Knee Boards — Allowing workers to kneel on the wet concrete for detailed finishing without leaving marks

What they say

Hide

below but tell me what you think now as a contractor I don't just worry about my 5-year game plan there is more to it I actually break each season down and think about the worst possible case scenarios inside of a season so let's take snowplowing for instance if I want to survive a bad snow plowing season I don't put all my eggs in one basket and go out and bid on an hourly basis I have some hourly accounts so if it does get snowy I'm covered but I also have some monthly account accounts and monthly accounts means these are accounts that pay me whether I plow or don't plow and I get this balance between accounts so that season no matter what can happen I Will Survive That season into the next season but now when it comes to spring summer and fall and you can get these really rainy seasons and I don't worry about drought so much because I just don't mow Lawns so I don't have to worry about making Tall Grass short but I do worry about excess rain and the way you can combat excess rain as a contractor that does what we do is demolition Demolition and working off from hard surfaces so not only do I look for a number of jobs that are my typical profit makers but I also look for those jobs that if it starts pouring rain down I have a hard surface that I can work off from doing a building demolition doing uh uh new retaining walls off from a driveway those are things that allow me to for the most part continue work and not completely shut my job sites down what do you guys do but that's it for this video hope you guys enjoyed going along for the ride God bless and go get him you guys we'll catch you on another one good morning everyone all

Auto-generated from the video audio.