Skip to main content

Demolition and Initial Site Clearing

0:00
0:31
1.8K views

At 0:00 in

Next up after demo: pool coping

What happens here

Begin by assessing the existing backyard landscape, identifying structures to be removed or modified. The initial phase involves the demolition of old features such as brick columns, an existing patio, and potentially an overly high retaining wall. Use heavy machinery like mini-excavators or skid steers for large-scale demolition and debris removal. Ensure all utility lines (electrical, gas, water) are safely disconnected or rerouted if they interfere with demolition. This phase generates a significant amount of debris which needs to be properly disposed of.

Goal: Clear the site of old structures and prepare for new construction.

Tools and materials

  • Gloves Various — Hand protection from rough materials and blisters
  • Hard hat Various — Head protection during demolition
  • Jackhammer/Concrete Breaker Various — Breaking up concrete patios and foundations
  • Mini-excavator Various — Large-scale demolition, excavation, and material handling
  • Safety glasses/goggles Various — Eye protection from flying debris
  • Shovels and picks Various — Manual excavation and clearing debris
  • Sledgehammer Various — Manual demolition of smaller brick structures or breaking up concrete
  • Steel-toed boots Various — Foot protection from falling objects
  • Utility Locate Service — Marking underground utility lines
  • Wheelbarrow Various — Transporting debris and materials