What happens here
Workers meticulously spread a layer of gravel into the previously excavated trench, ensuring an even distribution. A vibratory plate compactor is then brought in and operated by one of the crew members, systematically moving along the trench to compact the gravel. This action consolidates the material, removing air pockets and creating a dense, stable base for the new retaining wall. Other crew members assist with shovels and rakes to level the gravel and maintain the trench's dimensions during compaction.
Goal: The excavated trench for the retaining wall is backfilled with gravel, which is then compacted using a vibratory plate compactor to create a solid and stable foundation.
Tools and materials
- Rakes
- Safety vest
- Shovels
- Vibratory Plate Compactor
- Gravel Unspecified