Install Vapor Barrier & Rough-in Plumbing
At 0:53 in
Man cave bathroom remodel. Extreme home make over
What happens here
After the insulation is in place, the entire area where the rock panels will be installed is draped with clear plastic sheeting. This creates a continuous vapor barrier, essential in a wet environment like a shower. The video shows that the plumbing for three shower heads, including one outside the main shower area (behind a wall), has been meticulously installed and secured within the wall cavities before the plastic is applied. This ensures all water supply lines are ready and concealed behind the finished surface.
Goal: Completely cover the insulated walls with clear plastic sheeting to act as a vapor barrier. Simultaneously, ensure all necessary plumbing for shower heads is roughed-in and securely installed behind the future rock panels.
Tools and materials
- PEX piping
- Staple Gun
- Clear Plastic Sheeting
What they say
(367 characters)Hide
What they say
(367 characters)Auto-generated from the video audio.