Skip to main content

Final Cap Stone Installation and Project Hand-off

10:13
15:10
66.4K views

At 10:13 in

Lost $14,500 on this Jobsite 4/4

What happens here

The final cap blocks are meticulously placed and secured with adhesive on the upper sections of the retaining wall, including the curved radius. Sam is seen applying the adhesive with a caulk gun and carefully positioning the blocks. Upon completion of the last cap block, Sam marks it with the names of the crew members ('Blaine/Sam/Tim/Alex/Zach') and the date ('12/1/20'), along with 'Dirt Monkey Inc.' signifying the official completion of the retaining wall. This act symbolizes the culmination of the project's physical construction. The cap blocks not only add a finished aesthetic but also protect the top of the wall from weather and provide structural integrity.

Goal: The remaining cap blocks are installed and secured, completing the retaining wall, and marking the end of the primary construction phase.

Tools and materials

  • Caulk Gun
  • Permanent Marker
  • Cap Blocks
  • Construction Adhesive

What they say

Hide

all right got all the cuts down for the little radius here now we're just gonna get some glue down well we're gonna clean the top of these blocks off and get some glue down put the caps back then i have two more cuts i got to do up there so get those cut sign the back of them and that'll be that on the wall so it's the last cut just measured it out

Auto-generated from the video audio.