Observe and Correct Fundamental Construction Errors
At 2:09 in
Landscaping, Construction Nightmare - How to Hire a Contractor BLOCKED VERSION
What happens here
Upon visiting the site, the speaker identifies several fundamental errors made by the contractors: 1. **No base aggregate:** The base course of the retaining wall lacked proper aggregate material for stability. 2. **No drainage aggregate:** The contractors intended to backfill the wall with existing on-site soils instead of appropriate drainage aggregate, which is essential to prevent water pressure buildup. 3. **No compensation for structural weight:** The design did not account for the weight of structures (surcharge) that the wall would be holding back, leading to eventual failure. 4. **No compensation for excess water:** The plan did not address the excess water that would be directed at the retaining wall, further compromising its integrity. These mistakes would lead to the wall's failure within one or two seasons.
Goal: The speaker visits the job site and points out four basic, yet critical, mistakes made by the inexperienced contractors during the new retaining wall installation, all of which relate to improper ground preparation and material use.
Tools and materials
- Base aggregate
- Drainage aggregate (e.g
- 3/4 inch rock)
- On-site soils
What they say
(1,795 characters)Hide
What they say
(1,795 characters)Auto-generated from the video audio.