To correct the lack of drainage aggregate, the speaker quickly calculates the amount of 3/4 inch rock needed. He explains the formula: 200 pounds per square foot (typical surcharge) divided by 2000 (pounds per ton), multiplied by the total square footage of the wall. For this specific job, 26.4 tons of 3/4 inch rock were required to properly address drainage and surcharge.

Goal: The speaker demonstrates how to calculate the necessary amount of drainage aggregate for the retaining wall, emphasizing that this crucial step was overlooked by the inexperienced contractors.

Tools and materials

  • 3/4 inch rock N/A

What they say

Hide

2,000 that's how you figure out how many tons of material you need for a retaining W guys you need 26.4 tons of 3/4 in rock to do this job right the right way they were going to core fill with this on-site soils if they did that this wall would have failed probably within one or two seasons so a couple couple little keys to keep you guys on the right track this was a for sure failure for two parties the parties that were

Auto-generated from the video audio.