Skip to main content

Prepare the Earth Auger for Use

0:00
1:04
18.1K views

At 0:00 in

Kickstand kicks it. #construction #contractor #tools #shorts

What happens here

The video begins with the operator unfolding the Earthquake 60-volt Earth auger, which is initially in a compact, wheeled transport position. After unfolding, he positions the auger upright at the desired location for digging a hole. This setup phase prepares the tool for immediate use.

Goal: Set up the Earth auger in the digging position.

What they say

Hide

>> Andy, can you take one hand off and do it? Hold it in the air for me once. All right. So, tell me about this, will you? So, this is the Earthquake. This is the Earthquake 60 volt earth augur with an 8 in high performance auger bit. And it's also got our outrigger torque reduction

Auto-generated from the video audio.