Skip to main content

Prepare Modular Home Sections and Site

0:00
11:42
18.6K views

At 0:00 in

Joining the 2 houses together 4K

What happens here

The video begins with initial preparations beneath the modular home sections. A worker is seen using an oscillating multi-tool to cut a black plastic sheeting (likely part of the underbelly vapor barrier or protective wrap) that hangs from the underside of one half of the modular home. This step is crucial for either preparing the section for transport or accessing components beneath, such as plumbing or structural elements. The area around the house is muddy and covered with fallen leaves, indicating outdoor work in potentially damp conditions. There is also pink insulation hanging down, suggesting that water or damage may have compromised the integrity of the underbelly. The worker is wearing gloves for protection.

Goal: Prepare the modular home halves and the ground for movement and installation

Tools and materials

  • Gloves HydraHyde — Protecting hands during cutting and handling materials
  • Insulation — Insulation seen hanging from the underside
  • Oscillating Multi-Tool — Cutting plastic sheeting and potentially other materials under the modular home
  • Plastic Sheeting — Part of the modular home's underbelly or protective wrap