Position First Section on Foundation
1:05
11:42
18.6K views
At 1:05 in
Joining the 2 houses together 4K
What happens here
Upon arrival at the site, a backhoe or front-end loader is utilized to carefully maneuver and push the first modular section into its precise position on the pre-built concrete block foundation. This requires skilled operation and coordination to ensure the section is level and correctly placed.
Goal: Secure the first modular section onto its foundation
Tools and materials
- Backhoe/Front-End Loader JCB — Pushing and positioning the modular section
- Concrete Blocks — Forming the foundation of the modular home
- Hydraulic Jacks — Making fine height adjustments and leveling the section
What they say
(79 characters)Hide
What they say
(79 characters)Auto-generated from the video audio.