Establish Measurable Performance Metrics (M)
At 1:10 in
John Lee Dumas - Goals are the Success Secret of 1,000 Entrepreneurs
What happens here
For each specific objective, determine how its achievement will be measured. For instance, if the objective is to reduce fuel consumption, the metric would be 'gallons per hour' or 'kWh per gallon.' For eliminating overloads, the metric could be 'number of overload events per month' or 'duration of overload events.' This requires implementing smart sensors and monitoring equipment capable of collecting precise data on power output (kW, kVA), current (Amps), voltage, frequency, fuel levels, and alarm conditions. The smart control system should be configured to log and report these metrics regularly.
Goal: Based on the 'Measurable' principle, set up concrete metrics and data collection methods to quantify progress towards your defined load management objectives.
Tools and materials
- Generator Control Unit (GCU)
- SCADA/EMS (Energy Management System)
- Smart Meters/Data Loggers
What they say
(775 characters)Hide
What they say
(775 characters)Auto-generated from the video audio.