Develop Actionable Control Strategies (A)
At 1:52 in
John Lee Dumas - Goals are the Success Secret of 1,000 Entrepreneurs
What happens here
This is where the 'smart controls' come into play. Develop the algorithms and programming for the smart control system to take concrete actions based on monitored data. Examples include: implementing automatic load shedding for non-critical loads when generator output reaches a predefined threshold (e.g., 85% capacity); programming load prioritization schemes to ensure critical systems remain powered during high-demand or emergency situations; or automatically shifting loads to an alternative power source when generator parameters indicate stress. The goal is to create a dynamic system that responds proactively to prevent overloads and optimize efficiency.
Goal: Using the 'Actionable' component, design and implement the automated control logic within your smart system to actively manage generator loads and achieve the objectives.
Tools and materials
- Control Wiring and Interfacing Devices
- Programmable Logic Controller (PLC)
- SCADA/HMI Software
- Smart Relays/Circuit Breakers
What they say
(1,036 characters)Hide
What they say
(1,036 characters)Auto-generated from the video audio.