Resolve Electrical & Perform Initial Test
At 10:48 in
Installing & testing 3 new upgrades for the Power rake
What happens here
With the new 14-pin electrical connector obtained (or a temporary wiring solution implemented due to the old connector's damage), the team addresses the electrical hookup. The new connector is installed, or wires are run directly into the skid steer's cab from the power rake, allowing direct control from the joystick. Paul enters the skid steer and demonstrates the power rake's hydraulic swing, confirming that the new components function as intended, allowing precise 20-degree left and right movement.
Goal: The electrical connection for the power rake is secured, bypassing the damaged 14-pin connector by routing wires into the cab, and the hydraulic swing function is successfully tested.
Tools and materials
- Electrical Wiring (temporary)
- Joystick Control
- MTW Power Rake
- Skid Steer Loader
What they say
(2,497 characters)Hide
What they say
(2,497 characters)Auto-generated from the video audio.