Install Base Rows of Cedar Siding
At 3:43 in
Installing Cedar Siding Is Easier Than you Think
What happens here
Begin installing the cedar tongue and groove siding, starting with the first row directly above the siding vent. Traditionally, the tongue and groove design allows for concealed fastening by nailing through the tongue, which is then covered by the groove of the subsequent board. For the initial row, it's recommended to face-nail the bottom edge in addition to nailing through the tongue to prevent the board from 'kicking out' from the wall. For all subsequent rows, only nail through the tongue at an angle to secure the board and conceal the fasteners. Consistently use a level throughout the installation to ensure each row remains perfectly straight, as even small deviations can accumulate and affect the overall appearance.
Goal: Securely install the initial rows of cedar siding, ensuring proper concealment of fasteners.
Tools and materials
- 15-Gauge DA Nailer Ryobi — Fastening the cedar siding boards
- Cedar Tongue and Groove Siding — The primary material for the exterior cladding
- Exterior-Grade DA Nails — Securing the cedar siding
- Level — Ensuring the siding rows are perfectly horizontal
What they say
(2,497 characters)Hide
What they say
(2,497 characters)Auto-generated from the video audio.