Skip to main content

Assess Demolition Waste & Plan Disposal

0:00
38:28
378.6K views

At 0:00 in

INSANE Kitchen Renovation On a Budget $$$

What happens here

The video opens by showcasing the existing kitchen in a state ready for demolition, with old cabinets, countertops, and ceiling elements present. The initial act of removing lower cabinets and breaking through drywall (0:17-0:49) immediately generates a substantial amount of debris. Before beginning, a thorough assessment of these materials (wood, drywall, old appliances, potentially plumbing fixtures) is crucial to estimate the total volume of waste. This information is then used to select the correct dumpster size (e.g., 10-yard, 20-yard, 30-yard) and frequency of pickup, which directly impacts the overall waste disposal budget. Consideration should be given to any hazardous materials (e.g., asbestos in older homes, lead paint) that require specialized disposal procedures and additional costs, although no such materials are identified in this video. Planning the dumpster placement on the property is also important for accessibility and minimizing disruption.

Goal: Before active demolition, assess the volume and types of materials to be removed to select an appropriate dumpster size and understand potential disposal complexities. This initial phase involves generating significant debris from old cabinets, countertops, and wall materials.

Tools and materials

  • Camera/Smartphone
  • Dust Mask
  • Gloves
  • Measuring Tape
  • Safety Glasses