Skip to main content

Prepare Wood and Stacking Area

0:00
26:54
33.5K views

At 0:00 in

I'm leaving the Country

What happens here

The video briefly shows large piles of already processed firewood, indicating that the initial steps of felling, blocking (cutting into lengths), limbing (removing branches), and splitting the wood have been completed. Before stacking, clear the chosen area of any debris, leaves, or snow, creating a clean base for the woodpile. This ensures a dry and stable foundation for the stacks.

Goal: Ensure firewood is already felled, blocked, limbed, and split. Clear the stacking area of debris and snow to prepare for laying down a base that will keep the wood off the ground.

What they say

Hide

good morning one and all only a fool would believe that history never repeats itself only a fool would put your own fate in someone else's hands believing that they firmly have your best interests at heart and you guys are no fool and I'm no fool I believe that you have to have a backup plan to your backup plan I'm gonna go over mine today you guys have never known about this I've never talked about this before in any video this is a side of me that you're like oh dirt monkey going crazy no this is a side of me that has always been there but I've never shown it because a good backup plan the best backup plan you never reveal I'm starting to share things with you in my videos that I've never shared before and I don't know if I'm even should be doing this to be 100% honest with you but let's just dive into today's video all right good morning one and all it's wood processing day today how you doing Frankie where do that go I don't know he always buy his car okay so oh we got all the wood split

Auto-generated from the video audio.