Skip to main content

Install the First Course

1:15
9:49
992 views

At 1:15 in

I Turned Old Barn Wood Into a Garage Accent Wall

What happens here

Begin installing the first course of barn wood planks at the bottom of the wall. Place the first board tight against the corner of the wall. Use a level (e.g., a Pittsburgh level) to ensure the board is perfectly horizontal. Once level, use a nail gun loaded with 2 1/2-inch, 16-gauge finish nails (e.g., Ridgid brand) to secure the board to the wall studs. This first course is critical, as any misalignment will compound with subsequent rows, leading to a wavy and uneven wall. Ensure a nail is placed in every stud along the length of the board for maximum stability.

Goal: Create a level and stable base for the wall cladding

Tools and materials

  • Finish Nails — Securing the barn wood planks to the wall studs
  • Level Pittsburgh — Ensuring the boards are perfectly horizontal
  • Nail Gun Ridgid — Quickly and securely attaching the boards
  • Reclaimed Barn Wood Planks — The planks being installed as the first course

What they say

Hide

both of them, and just clean them up. All right, so once we got the board on the wall like this and we got our ends cleaned up, I'm going to go all the way tight to this wall. We want to level our bottom course and I'm just going to go ahead and put a couple nails in here. I'm using 2 and 1/2-in 16-gauge finish nails for this project. Now I'm going to go ahead and I'm going to pop a nail in every one of these studs. And that board is absolutely not going anywhere. Now when we put our second course on top of this, it should be level and we'll check level as we go, but it's most important to get this first course set before you build up cuz one little 1/4-in gap could turn into a whole wavy mess with gaps and a bunch of other stuff as you go. So level out your first course and work your way up.

Auto-generated from the video audio.