Initial Shelter Placement & Site Overview
At 0:00 in
I REFUSE the CUSTOMERS request. Bomb shelter: FINAL chapter
What happens here
The video begins with a Kubota SVL 75-2 compact track loader (skid steer) and a Daewoo excavator on a snowy construction site. The large corrugated metal pipe, approximately 10 feet in length, is being maneuvered into an excavated trench. A GoPro camera mounted inside the pipe shows the skid steer driving through, indicating initial attempts at internal setup. Construction materials are visible near and within the pipe. At this stage, the project is still in its early installation phase, indicating the need for careful adherence to site-specific building codes.
Goal: This step shows the initial placement of a large corrugated metal pipe into an excavated trench, intended as an underground shelter. Heavy machinery is used to maneuver the pipe into position.
Tools and materials
- Daewoo Excavator
- GoPro Camera
- Kubota SVL 75-2 Compact Track Loader
- Large Corrugated Metal Pipe
What they say
(85 characters)Hide
What they say
(85 characters)Auto-generated from the video audio.