Position First Helical Pile Assembly
0:45
1:46
10.2K views
At 0:45 in
I can't think of a better use case to show how versatile helical piles are!
What happens here
With the helical pile attached to the driver, multiple team members carefully lift and maneuver the entire assembly into the first designated position on the deck framing. It's crucial to align the pile vertically and precisely at the marked location to ensure the structural integrity of the new roof. Given the weight, clear communication and coordinated lifting are essential to prevent injury.
Goal: Accurately place the helical pile and driver at the first footing location.
Tools and materials
- Deck Framing — Providing a reference point and working surface for positioning
- Helical Pile Driver Assembly — The combined driver and helical pile unit