Skip to main content

Position First Helical Pile Assembly

0:45
1:46
10.2K views

At 0:45 in

I can't think of a better use case to show how versatile helical piles are!

What happens here

With the helical pile attached to the driver, multiple team members carefully lift and maneuver the entire assembly into the first designated position on the deck framing. It's crucial to align the pile vertically and precisely at the marked location to ensure the structural integrity of the new roof. Given the weight, clear communication and coordinated lifting are essential to prevent injury.

Goal: Accurately place the helical pile and driver at the first footing location.

Tools and materials

  • Deck Framing — Providing a reference point and working surface for positioning
  • Helical Pile Driver Assembly — The combined driver and helical pile unit

What they say

Hide

Ah. That's We need one more person for lifting. All right, what are we doing here? There you go. A little bit. Okay. Give it a twist. Woo. See, the problem is I I did work out 2 days ago, so my muscles are a little taxed.

Auto-generated from the video audio.