Skip to main content

Install Initial Wood Paneling Sections

3:09
10:11
8.2K views

At 3:09 in

I bought a Scissor Lift! 4K

What happens here

Position the Cruiser Products scissor lift to access the upper sections of the cabin walls. Working in a two-person team, one individual (Frankie) operates the lift and performs the installation, while the other (Zakk) assists by handing up prepared wood planks. Securely fasten the wood planks to the wall using a nail gun, ensuring each piece is level and tightly fitted to create a continuous paneling surface. This step focuses on establishing the first sections of paneling, setting the pattern for subsequent installation.

Goal: Begin the installation of wood paneling on the cabin's high walls, utilizing the scissor lift for access and ensuring the initial pieces are level and securely fastened.

Tools and materials

  • Cruiser Products Scissor Lift
  • Level
  • Nail Gun
  • Wood Planks

What they say

Hide

Horn I was at the national farm and tractor pull show which is now officially my favorite show of all time when I first spotted it now it's pure battery powered so you just plug it into a 110 volt outlet and I was thinking this is so perfect for interior work no more ladders nothing and it doesn't weigh that much two guys can manhandle it into a 3 uh 32 inch door actually we don't even have a 36in door we got it snuck inide here the only thing that I wish this thing would do that it doesn't do is go about four extra feet higher cuz when we get to the peak of our big wall in this cabin we had to revert back to scaffolding but up to that point man is this thing just [Music] w [Music] [Applause] when I first built the cabin we just sheetrocked the wall just to get it enclosed secured airtight and sealed but

Auto-generated from the video audio.