Joist Installation and Subfloor
At 0:39 in
How your house gets built π #build #learn #framing #footings #construction
What happens here
Floor joists or I-joists are then installed, spanning from the exterior foundation to the interior beam. These joists are the horizontal members that form the floor frame and support the subfloor. They are typically face-nailed from the outside into the band joist and toe-nailed from the inside. After the joists are in place, the subfloor is installed. The subfloor consists of 4x8 sheets of 23/32 inch (or 3/4 inch or thicker) OSB (oriented strand board) or plywood. The seams of the subfloor sheets are staggered over the joists to enhance structural integrity.
Goal: Construct the floor system by installing joists and applying the subfloor.
Tools and materials
- Joist / I-Joist Models N/A β Representing the horizontal floor framing members
- Pointer Stick N/A β Highlighting different components of the model
- Subfloor Sheets β Representing OSB or plywood subfloor panels
What they say
(533 characters)Hide
What they say
(533 characters)Auto-generated from the video audio.