Site Preparation and Custom Stone Sourcing Strategy
At 1:10 in
How To Update The Appearance Of A Home with Retaining Walls
What happens here
With the old retaining walls removed, the site is prepared for the new construction. The next crucial phase involves a unique stone sourcing strategy: rather than ordering pre-selected boulders, the team will transport their Daewoo 75V excavator to an aggregate pit to hand-pick each stone. This approach allows for meticulous selection of boulders to fit a 'modular type of design' featuring flat faces and tops, ensuring aesthetic and structural integrity. The video shows the Daewoo 75V excavator being loaded onto a heavy-duty flatbed trailer, ready for transport to the aggregate pit.
Goal: Remove existing walls and prepare for custom boulder selection
Tools and materials
- Chains and Binders — Securing the excavator to the trailer for safe transport
- Daewoo 75V Excavator Daewoo — Removing old walls, loading and unloading from trailer, moving large boulders, and site grading
- Flatbed Trailer — Transporting the excavator to and from the aggregate pit
What they say
(1,594 characters)Hide
What they say
(1,594 characters)Auto-generated from the video audio.