Understand Project Goal and Machine
0:00
16:43
67.7K views
At 0:00 in
How to run a Skid steer
What happens here
The main objective is to move existing piles of dirt (construction debris from a prior project) to lower areas of the site to level the ground. The instructor emphasizes a step-by-step approach for a new operator, focusing on progressive learning rather than immediate efficiency. The primary machine for this task is identified as an ASV RT-75 Posi-Track skid steer, highlighting its closed-cab design and joystick controls.
Goal: The instructor introduces the project, which involves moving dirt piles to fill low spots on an outdoor site, and begins by familiarizing a new operator with the ASV RT-75 Posi-Track skid steer.
Tools and materials
- ASV RT-75 Posi-Track Skid Steer
What they say
(983 characters)Hide
What they say
(983 characters)Auto-generated from the video audio.