Skip to main content

Sectioning the Work Area

1:48
4:38
1.1M views

At 1:48 in

How to Resurface Concrete for Beginners Part 2 $660 DIY Driveway repair / restoration project

What happens here

Due to Flow Coat's relatively fast setting time, it is crucial to section off your larger driveway area into smaller, manageable 'bite-sized chunks.' Aim for sections of approximately 100 to 150 square feet at a time to ensure you can apply and spread the material effectively before it begins to set.

Goal: Manage Flow Coat application before it sets by dividing the work area.

What they say

Hide

surface. And that means we've got to patch it, repair it, and clean it. And that's in part one of our three-part series. Make sure you check that video out before you go any further. Now, flow coat sets up relatively fast. So, make sure you section off a larger area into a smaller bite-sized chunk anywhere from 100 to 150 square ft at a time. Control drains must be maintained. The easiest way to do that is either with a foam insert or weather stripping.

Auto-generated from the video audio.