Skip to main content

Apply First Coat of Paint to Ceiling

1:41
7:33
385.7K views

At 1:41 in

How To Paint A Ceiling With A Roller. Painting A Ceiling.

What happens here

Once all the cut-ins are complete, immediately begin applying the first coat of paint to the main ceiling area. Use a 9-inch nap roller attached to an extension pole to reach the ceiling comfortably and efficiently. Start rolling in one corner of the room and systematically work your way across to the opposite side. The most critical aspect of this step is to maintain a 'wet edge' at all times. This means each new pass with the roller should slightly overlap the previous section of wet paint. By consistently overlapping wet paint, you prevent unsightly lap marks and ensure a smooth, uniform finish across the entire ceiling. Remember to frequently load your roller with paint to ensure adequate coverage and prevent dry spots.

Goal: Cover the entire ceiling with a uniform first coat of paint, avoiding lap marks

Tools and materials

  • 9-inch nap roller PurdyApplying paint to the main ceiling surface
  • Extension poleExtending the reach of the roller to comfortably paint the ceiling
  • Paint trayHolding paint for the roller and removing excess
  • Ceiling PaintColoring the ceiling

What they say

Hide

to start rolling now with my 9in nap. and want to start in one area and begin working your way from that area to the opposite side of the room. And you're going to be attempting to keep a wet edge. So, you don't want to you don't want to move from end to end of the room. You want to start one point and just work your way along keeping the paint wet in a wet edge. And it's extremely difficult to actually lay out a ceiling. So, you're just going to do the best you can, working quickly in the room and keeping a wet edge. So you had I just need to go pick it up. Yeah, it's the black one. Just getting one bite and that's all. You can see I'm continuing to paint only one direction rolling, keeping a wet edge. And I'm going to go back when it dries in about 30 minutes and roll it the opposite direction. While I'm rolling, I want to keep my tray at a nice good reach so I don't have to move around, walk to my tray. So, I want to keep it right near me. So, I just keep loading my nap up and keep rolling. See, I've got the entire ceiling rolled now. And it's wet. Been able to keep a wet edge. Definitely needs another coat and drying pretty quickly. So, we're going to go back and do our no next coat here fairly. So, now I got my first coat done. It's almost dry. Getting ready to do my second coat the opposite direction. And I ran it this direction, keeping a wet edge. Now I'm going to run it the opposite direction, keeping a wet edge, and my ceiling will be done. And then I'm going to go back and do my wall.

Auto-generated from the video audio.