Install Secondary Drain Tile and Final Grading

2:36
5:45
97.7K views

At 2:36 in

How to Make Money in the Mud

What happens here

A second drain tile system is installed to connect the homeowner's sump pump to the storm sewer inlet. This involves laying a 4-inch solid drain tile from the sump pump's discharge point to the main storm sewer. Due to extremely muddy conditions caused by recent rains, a Bobcat T180 skid steer loader and a Bobcat 325 mini excavator were used for the heavy excavation and final grading to prevent large ruts and ensure a smooth finish over the winter months. The mini excavator is operated to carefully backfill and smooth out the trench area.

Goal: Connect the sump pump to the storm sewer and perform final grading.

Tools and materials

  • Bobcat 325 Mini Excavator Bobcat — Excavating trenches, backfilling, and precise grading in tight spaces
  • Bobcat T180 Skid Steer Loader Bobcat — Heavy lifting and moving large quantities of soil
  • Shovels — Fine-tuning the grading and clearing debris
  • 4-inch Solid Drain Tile — Connecting the sump pump to the storm sewer inlet

What they say

Hide

stays stays the same good idea what a mud hole what happens when you try to do stuff in December and it rains two inches Green tile hook the sump up so we had no original work over here in the contract but we hooked the sump pump up to a four inch solid drain tile and whenever we delighted that down to that's basement [Music] [Applause]