Excavate Trench and Install Primary Drain Tile

0:15
5:45
97.7K views

At 0:15 in

How to Make Money in the Mud

What happens here

After identifying the problem, the crew begins removing the existing pavers from the patio area. They then excavate a trench along the edge of the patio, preparing for the French drain. The trench is lined with a geotextile fabric (landscape fabric) to prevent soil from mixing with the drainage gravel. A layer of 3/4-inch clear rock (gravel) is placed at the bottom of the fabric-lined trench, and then a 4-inch perforated drain tile is laid on top of the gravel. The system is designed to collect water from the patio and divert it away.

Goal: Install the main French drain system along the patio.

Tools and materials

  • Mini Excavator — Efficient excavation of the trench, especially in muddy conditions
  • Shovels — Removing soil and pavers, shaping the trench
  • 3/4-inch Clear Rock — Providing drainage around the perforated pipe
  • 4-inch Perforated Drain Tile — Collecting and transporting water
  • Geotextile Fabric — Lining the trench to separate soil from gravel
  • Pavers — The existing patio material to be removed and possibly reinstalled

What they say

Hide

post right here tim is shooting the grade what we're going to be installing is a French drain system so we're gonna tear apart the patio we're gonna put 3/4 clear Rock in for its perforated drain tile we're gonna take it from this point to walking the path right now that's the

Auto-generated from the video audio.