Compare Lump Sum vs. Hourly Rates
At 2:05 in
How to Make a Killing SnowPlowing
What happens here
The video provides a detailed hourly comparison to illustrate the profitability. A 'one-off' lot paid $300 for 30 minutes of work (using one pickup truck), which equates to $600 per hour. This is contrasted with a larger operation involving multiple pieces of equipment on hourly rates: two backhoe loaders (TLBs) at $110/hour each ($220 total), four skid steers at $68/hour each ($272 total), and three pickup trucks at $57/hour each ($171 total). The combined gross revenue for all nine pieces of equipment is $663 per hour. The presenter emphasizes that after subtracting wages for nine operators, fuel, tire wear, and maintenance, the net hourly profit from the fleet would be significantly lower than the single pickup truck's $600/hour. This highlights the concept that small, direct contracts can be disproportionately lucrative.
Goal: Quantify the financial benefits of lump-sum contracts over hourly rates.
Tools and materials
- Calculator/Spreadsheet — Calculating and comparing hourly rates and profits
What they say
(905 characters)Hide
What they say
(905 characters)Auto-generated from the video audio.