Wire Panel and Install Breakers

1:31
2:53
8.3K views

At 1:31 in

How to make $1000 in 1 Day as an Electrician #bluecollar

What happens here

Proceed to wire the sub panel, following a specific order for safety and code compliance. First, connect all ground wires (typically green or bare copper) to the dedicated ground bar. Next, connect the neutral wires (white wires), ensuring that any black wires used as neutrals are properly marked with white electrical tape. Finally, connect the hot wires (black, red, or other colors) to their respective circuit breakers, installing the breakers into the panel's bus bar. In this instance, 50-amp breakers are installed for the EV chargers and a 30-amp breaker for the generator inlet.

Goal: Connect all electrical circuits and install protective breakers in the sub panel.

Tools and materials

  • Circuit Breaker — Providing overcurrent protection for the generator inlet
  • Circuit Breakers — Providing overcurrent protection for the EV chargers
  • Electrical Tape — Marking non-white wires as neutral conductors
  • Ground Wires — Connecting to the ground bar for safety
  • Hot Wires — Connecting to the circuit breakers
  • Neutral Wires — Connecting to the neutral bar
  • Screwdriver — Tightening terminal screws for wires and breakers

What they say

Hide

we're almost done here all right guys getting to the end last step in the sub panel is putting in the breakers you should always do the grounds first then the neutral that's what I did some of the wiring guys make sure you tape your neutrals white so I use a black wire but I taped it white you have to tape it white for a code I got my grounds separated uh I had to you know extend my grounds a little bit cuz they were a little short but got my grounds there and my Hots the double poles let's get the cover on