Lay and Level the Sand Setting Bed
6:00
12:30
210.4K views
At 6:00 in
How to Install Paver Patios, Walks and Driveways
What happens here
Install screed rails (metal rods) across the prepared base material. These rails act as guides to ensure a consistent 1 1/8 inch layer of sand, which is critical for paver stability. Using a level on the screed rails, ensure the precise pitch for drainage is maintained. The sand is then spread over the base and leveled using a straight edge that slides along the screed rails. Once a section is leveled, the screed rails are carefully removed, and the small channels left behind are filled with sand.
Goal: Create a perfectly level (with desired pitch) and consistent sand bed for pavers.
Tools and materials
- Level — Checking the pitch and level of the screed rails and sand
- Screed Rails — Guiding the screed board to create a uniform sand layer
- Shovel — Spreading sand onto the base
- Straight Edge — Spreading and leveling the sand layer
- Sand — Creating the setting bed for the pavers