What happens here

Once the drain tile, fabric, and gravel are in place, the trench is backfilled with the soil that was initially excavated. Heavy machinery (mini-excavator and skid steer) is used to carefully push the soil back into the trench. Initial rough grading of the yard is performed to ensure that surface water will naturally flow towards the French drain system, preventing pooling and directing it into the permeable gravel layer. The video highlights challenges due to consistently wet weather, requiring careful management of muddy conditions and using tracked machines for better mobility.

Goal: The trench is backfilled with excavated soil, and initial grading is performed to begin shaping the yard and direct surface water towards the newly installed drain.

Tools and materials

  • Mini-excavator Bobcat 325
  • Shovels
  • Skid steer ASV RT-75
  • ASV RT-30

What they say

Hide

project it continued to rain on us day after day making the site almost inaccessible with a skid loader with wheels we ended up using two different ASVs on this project we've got our standard ASV 75 which we used for a lot of the main dirt moving but we also ended up renting an AS VRT 30 just to get it into the site into some of the tighter areas because we had nothing else that could actually move around and also get the job done so that's something to consider when you guys are doing your own French drain remember it's going to be already wet conditions and then if Mother Nature doesn't cooperate it's going to make a challenging site even more difficult so make sure that you have the right equipment right out of the gate ready to go and because the site was so wet we had to actually do this job in stages instead of opening up the entire trench putting in our drain tile system our fabric our rock and then closing it up we had to actually open up a small section make sure that we had all our benchmarks right and then close it up because we actually couldn't get around any other way it was just too muddy to monkey and too challenging to crack open the entire site and hope that we could squirm our way past this trench without collapsing anything in or altering any of the elevations remember your elevations have to stay consistent or you're going to be trapping water underground so you want to have one inch of drop for every eight feet of run and that's a minimum if you can go more aggressive do it now in this case we had 200 linear feet of drain tile system that was going in and we knew that from the outlet in our storm sewer to our grade 200 feet away we had a 24 inch change in elevation and so we divided that up so that we had 12 inches of drop for every 100 feet of run so that's how we did this project whatever your numbers are whatever your calculations are make sure that you get that figured out before you start cracking open the ground so it's important to remember that your outlet