Implement Elevation Transitions

19:30
20:42
251K views

At 19:30 in

How to Install a CHEAP Boulder Retaining wall with just a skid steer and scrap field stones

What happens here

When the terrain requires a change in the wall's elevation, implement transitions using a gradual step-down approach. For example, transition from two stacked stones to three stacked stones. Crucially, maintain a relatively flat top surface across the wall, even during elevation changes. This ensures structural integrity and a visually appealing finish. This technique allows the wall to adapt to varying landscape contours while remaining strong and cohesive.

Goal: Manage changes in wall elevation using 2-to-3 stone transitions while maintaining a flat top.

Tools and materials

  • Boulders

What they say

Hide

for excess water all right guys one last thing that I want to cover is two to three stone transitions and maintaining that same level or that same line of sight here we've got two stones stacked up and then we go to a three stone transition but we don't have this uneven top we still have a very fill as relatively flat top so you can see that it can be done and this is how you'll do a transition when you're working at changing your elevations inside of your wall all right you guys you got to tell

Auto-generated from the video audio.