Skip to main content

Prepare Essential Tools and Site

6:42
26:59
33.3K views

At 6:42 in

How to install a backyard POND in ONE day Steps 1-7

What happens here

The presenter highlights a prepared tool bucket containing essential items like pliers, spray paint, a heat gun, electrical tape, and a utility knife, stating that nothing overly technical is required. He mentions that a wheelbarrow and a ball cart (depending on boulder size) are also useful. The emphasis is on using basic tools to complete a $9,000 job without expensive high-tech equipment. The estimated total cost for a DIY installer is about $2,000 for materials (kit + rocks/gravel) plus labor.

Goal: This step focuses on gathering and organizing the basic tools needed for the pond construction and reiterates the overall cost for the DIY installer.

Tools and materials

  • Ball Cart
  • Electrical Tape
  • Heat Gun
  • Pliers
  • Shovels
  • Spray Paint
  • Tool Bucket
  • Utility Knife
  • Wheelbarrow

What they say

Hide

haul them out so what we're gonna do is we're gonna blend all those different things together the big boulders are gonna be for the waterfall as well as some of the accents medium boulders are gonna fill the majority then that small rock is going in between everything the reason we do that is we want that naturalistic look if you did a pun completely out of small rock it looks bad if you did a an entire pound out of monster boulders it looks bad because in nature that doesn't happen you want that contrast a big rock looks big because there's a small rock next to it when you take a small rock and put it next to this other one it gives people perspective so we've got 1300 in the kit with bold it with rocks rocks about two grand five hundred five tons typically a rock price is gonna be around $80 a ton if you're using field stone boulders at least in my necklace around here were about 120 okay honey let's just call it a hundred bucks a ton so we've got 500 bucks in Rock yep and then another $100 $150 in gravel okay so we got two grand in materials a day's labor and you're charging nine grand for this just for this job 11 by 11 is nine so this one's gonna be an 11 by 16 we're gonna probably be in the 11 grant 11 range so the guys are gonna walk home that night with about eight thousand dollars of profit in their pocket and then they're not gonna work all next week and just do one more the following week and make more than you can in a white-collar job so this is that step two we talked about very first thing I want to do is get this thing located to where it's gonna sit in the yard okay because and then get this located hook up the fittings hook up the plumbing into the back to cos and all the spoils from here get flipped put over here and now we get to spare you this thing if you can take all

Auto-generated from the video audio.