Skip to main content

Backfill and Rough Grade Pool Area

4:03
5:57
1.2M views

At 4:03 in

How to handle a Pool Demolition that Refuses to pay in Eagan MN

What happens here

With the pool structure primarily removed, the Bobcat S185 skid steer is brought in to begin backfilling the large excavation with new soil. The skid steer moves large piles of dirt into the former pool area, spreading and compacting it as it drives over the fill. During this process, the ground can become significantly muddy, especially if it rains, making navigation challenging for the machinery. The initial backfilling establishes the base level for the new ground, gradually filling the void left by the pool.

Goal: Fill the excavated pool area with soil and establish the initial ground level.

Tools and materials

  • Bobcat S185 Skid Steer Loader Bobcat — Transporting and spreading large quantities of dirt for backfilling and rough grading
  • Fill Dirt N/A — Filling the excavated pool area

What they say

Hide

swimming pool now. We can't get a freaking break, man. We can't get a break. I'll come in and try to put a few hours in. It'll just hatch. Probably won't even hit it. Yeah. And then the next thing you know, it's downpouring. Downpouring. I got half my pile washing down the road. Golly. Oh, well, you got her off the street. We got her inside.

Auto-generated from the video audio.