Skip to main content

Heavy Equipment on the job- No room for Error

4:04
22.2K views

Video by Stanley "Dirt Monkey" Genadek

Stanley "Dirt Monkey" Genadek

What happens here

This project details the precise land grading process within a constrained residential-like environment, involving the excavation of existing muddy terrain, strategic delivery of Class 5 aggregate using various heavy machinery (mini excavator, compact utility loader, skid steer loader), and meticulous spreading and leveling to achieve a stable, even base for future construction or landscaping. The video highlights techniques for maneuvering equipment and material in tight spaces, such as between fence posts and existing structures.

Transcript

Hide

We have today is a very muddy site. Somehow we got to manage to get 6 in of class 5 in between these fence posts and this concrete slab. Even though you can ride on this, it's a pretty bumpy ride. You'll see what I mean. Way we're going to do it is we got to make the sub cut first. So we got to cut everything out. We're going to be using use a dingo and an excavator working hand in hand to do that. What you see him doing right now is he's getting the subcut prepped. We can't put 4 in of class 5 in without getting the extra dirt out. So, he's just simply using a mini axe. So, we're using this machine to squeeze in between the fence posts. The dingo works great, but we just can't keep doing the baby. We're figuring out a way we can use this skid loader in here to alioop it up and over the fence posts. He can put he can pour the whole thing there. Yep. Perfect. Perfect. Now we can get that dingo in there as well. So, we're wrapping this project up. this video's helped you out at all, do me a favor.

Auto-generated from the video audio.