Initial Aggregate Distribution with Compact Utility Loader
1:17
4:04
22.2K views
At 1:17 in
Heavy Equipment on the job- No room for Error
What happens here
Begin placing the Class 5 aggregate into the excavated pathway. A compact utility loader, specifically a Toro Dingo TX 427, is used for this task due to its maneuverability in tight spaces. Material is loaded into the Dingo's bucket, sometimes assisted by a worker manually shoveling from a nearby pile. The Dingo then drives backward along the path, distributing an initial layer of aggregate.
Goal: Transport and spread the first layers of Class 5 aggregate into the narrow graded area using a compact utility loader.
Tools and materials
- Shovel
- Class 5 Aggregate
What they say
(106 characters)Hide
What they say
(106 characters)Auto-generated from the video audio.