Ensure Consistent Concrete Pour and Drying

7:18
10:44
15.6K views

At 7:18 in

How to fix a Wet basement with Draintile

What happens here

As concrete is pumped into the trenches, a plastic sheet separates the new concrete from the drain tile and drainage material below. This prevents the concrete from clogging the drainage system. It is critical that all the concrete is poured and dries at a consistent rate to prevent differential cracking and settlement, which can compromise the integrity of the floor.

Goal: Achieve a uniform and stable concrete slab over the drain tile system.

Tools and materials

  • Plastic Sheeting — Separating the drainage system from the fresh concrete

What they say

Hide

the ex so here you can see how we get the concrete in place it's quick easy easy in comparison to bringing in bags of concrete hand mixing it and trying to get it Pour and the the key component to doing it this way is the consistency all of the concrete is wet at the same time and it all dries at the same time that's huge to make sure that you don't get any differential cracks and settlement in the creek as it's being process this is all just getting so what you heard him just say was that that entire area gets fill build in and I was talking about the differential drying between the materials when you have dry concrete and you put wet concrete next to it you get a crack that's not cohesive and eventually that crack will separate even further all the

Auto-generated from the video audio.