What happens here
As concrete is pumped into the trenches, a plastic sheet separates the new concrete from the drain tile and drainage material below. This prevents the concrete from clogging the drainage system. It is critical that all the concrete is poured and dries at a consistent rate to prevent differential cracking and settlement, which can compromise the integrity of the floor.
Goal: Achieve a uniform and stable concrete slab over the drain tile system.