Implement Exterior Regrading
At 2:02 in
How To fix A Wet Basement
What happens here
The video transitions to show the site after initial significant earthmoving and grading work has been completed. The area around the house has been excavated and reshaped to achieve a 'positive pitch,' meaning the ground now slopes down and away from the foundation. This intentional slope ensures that rainwater and surface water are directed away from the house's perimeter, preventing pooling and infiltration. The presenter highlights that the grading is done in such a way that water flows down and over the sidewalk, rather than getting trapped. Crucially, the subgrade has been raised to provide a minimum of 6 to 8 inches of clearance between the finished ground level and the sill plate of the house, which is essential to protect the wood structure from moisture damage.
Goal: Create a positive pitch for water drainage away from the foundation.
Tools and materials
- Rake — Spreading and leveling soil for a smooth finish
- Safety Glasses — Eye protection from flying debris during excavation
- Shovel — Manual fine-tuning of grading and digging in tight spaces
- Skid Steer Loader New Holland — Efficiently excavating, moving, and grading large volumes of soil
- Work Gloves — Protecting hands during manual labor and equipment operation
- Soil — To build up low areas and establish the desired grade
What they say
(782 characters)Hide
What they say
(782 characters)Auto-generated from the video audio.