Execute Exterior Subgrade Correction
At 2:02 in
How To fix A Wet Basement
What happens here
This step demonstrates the results of the exterior grading work. The existing subgrade around the house, particularly adjacent to the asphalt driveway, was previously lower than the driveway surface, creating a basin where water would collect and migrate towards the basement foundation. To rectify this, the subgrade was significantly raised and re-pitched to create a positive slope. This new grading ensures that water flows down and over the adjacent asphalt and away from the house, rather than collecting against the foundation. The successful re-grading also achieved the necessary 6 to 8 inches of clearance between the finished grade and the sill plate, which is crucial for preventing water damage to the structural components of the house.
Goal: Create a positive slope around the house to direct water away from the foundation
Tools and materials
- Rake Not specified — Spreading and leveling soil to achieve a smooth grade
- Shovel Not specified — Fine-tuning the grade and working in tighter areas
- Skid-steer loader New Holland — Moving and distributing large quantities of soil for re-grading
- Fill Dirt Not specified — Raising the subgrade and creating the desired positive pitch away from the foundation