Skip to main content

Prepare Subgrade for Optimal Drainage

0:44
11:43
15.3K views

At 0:44 in

How to fix a wet basement ! 4K

What happens here

The speaker elaborates on the technical aspects of subgrade preparation. It is crucial to achieve a specific slope, often referred to as a 'belly' or 'swale,' that guides water away from the house towards the furthest possible point without negatively impacting neighboring properties. A key warning is given against adding soil near the house, as this can lead to 'splash dirt' – cycles of wet and dry conditions that can cause wood rot in the structural framing behind the siding. The ideal subgrade should be a minimum of 8 inches below the sill plate (the lowest wooden structural component of the house) to provide adequate clearance and protection against moisture.

Goal: This step details the correct way to prepare the subgrade by creating a slope that directs water away from the house and ensuring an 8-inch clearance below the sill plate to prevent moisture damage and wood rot.

What they say

Hide

a minute what we really want to do is we want to make sure that we get a good slope here's a couple of the critical things and the things to not do wrong okay one we want to make sure that we get a nice belly or a slope so that the water comes away goes down into the middle or the furthest point away from the house as possible without impeding or flooding the neighbors next door a couple of the things that guys go wrong on this is instead of subtracting soil they add soil now we have what's called a sill plate right here not sure we're gonna be able to see it but right about here should be a green treated plate and that should rest on top of a CMU or concrete masonry wall so on this house there should be an eight foot basement down below here excuse me then the sill plate then the siding starts if we raise the dirt up what's going to happen you can see it happening right now this dirt right here this is Splash dirt okay and this is the last thing we want to do is raise this grade and having even more dirt and water splashing on the house because what it does is it gets wet it gets dry it gets wet it gets dry and that can create a lot of issues with the wood the stick framing behind the siding this doesn't really protect that that well from that constant exposure to the elements such as wet dry wet dry dry Rock can occur you can have the the Timbers fail etc etc so right in here the ideal thing is to have the sub grade a minimum of eight inches below the sill plate so from this point down to where your dirt starts whenever possible it's not always going to be possible but whenever possible it's good to have eight inches of clearance and then we want to make sure that the subgrade angles away it tapers up and then we can put on top of that our Dry Creek bed or our decorative rocker what have you does not have to be ugly it can be good looking so that's the application that we're going to be doing

Auto-generated from the video audio.