Install Liner and River Rock
At 10:37 in
How to fix a wet basement ! 4K
What happens here
With the subgrade properly prepared and sloped, the final layers of the dry creek bed are installed. A double layer of durable plastic liner is placed along the entire length of the trench. This liner acts as a barrier, preventing water from seeping into the ground and potentially reaching the foundation. Once the liner is in place, the trench is filled with 2-inch river rocks. These rocks not only contribute to the aesthetic appeal of the dry creek bed but also facilitate efficient water movement along the established slope, ensuring that water is effectively diverted away from the house. This completes the drainage solution.
Goal: After grading, a double layer of plastic liner is laid in the trench to prevent water penetration, and then the entire dry creek bed is covered with 2-inch river rocks for effective drainage and an aesthetic finish.
Tools and materials
- 2-inch River Rock
- Plastic liner
What they say
(747 characters)Hide
What they say
(747 characters)Auto-generated from the video audio.