Present Multiple Bid Options to Client

11:25
15:40
69.6K views

At 11:25 in

How to charge for Landscaping, Retaining walls, Patios and Outdoor Construction

What happens here

Following the analysis of the pool retaining wall, the speaker explains a dilemma: the client preferred minimizing yard disruption, which would necessitate more expensive manual labor ($12,000 estimate). The contractor, however, could remove a fence for easier equipment access, completing the job for about $10,300, but causing more yard disturbance. The recommendation is to provide the client with both estimates: one reflecting their preferences (higher cost due to increased labor/time) and one reflecting the contractor's preferred, more efficient method (lower cost due to equipment use). This approach puts the decision in the client's hands and offers transparency about cost drivers.

Goal: Using Project 1 as an example, the speaker advises offering clients two distinct bid options to empower them to choose between cost savings and convenience.

What they say

Hide

about. So Tim had a conundrum, guys. The gal he talked to was very uncomfortable with disturbing any soil in that area. Right. She seemed like she did not want to screw up much of the yard. And so Tim was opting to take out one section of fence and then try to skinny in between the fence and the pool and do the job, which drove his labor rate up. And his estimate came in at about $12,000 for that project. Is that about right? That was just for the wall portion cuz all the hand labor that it would take to pull all the blocks out. Yep. Carry them all in. You're not using a big machine to bring them in and out and then to take all that soil out. Yeah. That was Yep. That made my my go way up. Okay. So, I came in and I said, "Let's remove the entire fence, even though she doesn't want to do it, and we can then use equipment and do the exact same job complete, for about $10,000, what I say, $300 or so." So, what I'm going to recommend you guys do is give your customer two estimates in a case like this. One is do the job the way they want it done without disturbing anything, and maybe that jacks the price up to $12,000 or even more dollars. And then number two is give them an estimate doing the job the way that you want to do it where you uh have access with equipment and maybe it disturbs more area. But if it's going to shave 2,000 plus odd dollars off from your project, then the decision is in their ball court whether they want to save money and do it the way you want to do it or whether they want to spend more money and do it the way they want to do it. But by giving them the options, you're leaving the choice up to them. All right, Tim's got us looking at one of the easiest jobs that there is to bid, which is our retaining wall. But in this case, this

Auto-generated from the video audio.