Offer Multiple Client Options
At 12:20 in
How to charge for Landscaping, Retaining walls, Patios and Outdoor Construction
What happens here
In scenarios where site conditions make a project more expensive or difficult, the recommendation is to offer the client two distinct estimates. The first estimate reflects the client's preferred method (e.g., minimal disturbance), which might involve more manual labor and thus a higher cost. The second estimate, often lower in price, proposes the contractor's optimized method (e.g., removing a fence for machinery access), which might involve more initial disruption but saves costs overall. This approach allows clients to weigh their priorities (e.g., cost savings vs. minimal disturbance) and empowers them to make an informed decision, increasing the likelihood of securing the job.
Goal: Contractors are advised to provide clients with multiple bidding options to give them choice and control, which can lead to higher conversion rates and better project outcomes.
Tools and materials
- Estimation Software/Templates
What they say
(776 characters)Hide
What they say
(776 characters)Auto-generated from the video audio.