What happens here

The presenter explains standard tie-down configurations. For most equipment, a 4-point tie-down is used, requiring one chain and binder for each of the four corners of the unit, connecting to the trailer. However, for excavators like the one shown, a 5-point tie-down is required: the standard 4 points plus an additional chain secured over the boom of the excavator. This provides extra security against the boom swinging or shifting during transport.

Goal: This step explains the difference between 4-point and 5-point tie-down systems for securing equipment, emphasizing the need for an extra chain over the boom for excavators.

What they say

Hide

This is called the cheater bar for those of you unfamiliar with it. Okay. So, in today's example, we're going to do a fivepoint tie down. If you have a Bobcat, any other most other pieces of equipment, it's just a fourpoint. That four-point tie down means you got to have one chain from each corner of the unit down to the corner of the trailer. So, you have four separate chains, four separate binders. But when you're hauling an excavator like this one, you've got to have a fourpoint plus one extra chain going over the boom. I'm going to also show you how to cheat today. Now, I don't recommend this, but trust me, you're going to find yourself you're going to lose a chain going down the road. You're going to be short of chain. Somebody's going to take it off your trailer and you're going to be like, "Well, how do I do a four-point tie down with only two chains or three chains or whatever?" I'm going to teach you that today, too.

Auto-generated from the video audio.