Excavate for Geogrid Placement

0:00
19:47
462.8K views

At 0:00 in

How To Build an Engineered Retaining wall & Avoid Contractors that cut corners

What happens here

Excavate the area behind the retaining wall blocks to the specified depth and width required by the engineering plan. The excavation width needs to accommodate the block depth, the drainage aggregate zone, the structural fill, and the full length of the geogrid layers. For walls with a surcharge (like a parking area), the excavation for geogrid can be substantial, as seen for an 8-foot wall designed to hold a car, requiring 6 layers of 9-foot-6-inch long geogrid.

Goal: Proper excavation is essential to create enough space for the retaining wall blocks, drainage aggregate, structural fill, and geogrid layers.

Tools and materials

  • Excavator
  • Shovels
  • Skid Steer (Bobcat)

What they say

Hide

[Music] This is the perfect cross-section of a retaining wall. You can see where all the drainage aggregate is and then you can see where the structural fill soil