Skip to main content

Final Touches and Cleanup

14:20
15:19
554.2K views

At 14:20 in

How to Build a simple Ground level Deck in a weekend

What happens here

Perform any final touch-up work around the perimeter and transitions. This may involve pushing boards to eliminate small gaps or ensuring a flush finish against the house. The video also briefly shows an outdoor shower area, hinting at further projects to be completed, such as building a surround for the shower and potentially a wall on the exterior of the deck structure, though these are not part of the current deck installation instructions.

Goal: Ensure all deck boards are secure, aligned, and the area is tidy.

Tools and materials

  • Broom — Sweeping away debris and sawdust
  • Shims — Adjusting small gaps or misalignments in decking boards

What they say

Hide

in place. I got to do put a shim here just to push it over a little bit and then to get this one lined up. Okay. And then that's about and then go around the outside. Then we'll touch up this stuff here. And what are we going to do with this shower? Turn it on. Wash the dick a little bit. [Music] So, we got to build the surround. All right, guys. Well, we have a lot more projects going on here. We tore that whole roof off. It's about that took us about what 3 hours, Andrew. Something like that. Yeah. So, we got a lot done today, but uh hope this video's helped you guys out to learn how to install your own very own ground level deck. We're going to be doing a little bit of touch-up work building a wall on the outside of this thing yet. But, uh you see the basic structure how it goes in with this Moisture Shield product, how to picture frame everything. Hope this video's helped you out. Let me know in the comments down below if there's anything else you'd like to see and I'll see if I can uh do it for you. God bless.

Auto-generated from the video audio.